LEASIDE LOCK PHASE 3 EAST LONDON


Contractor: Henry Construction
Scope: Aluminium Windows and Doors, Aluminium Curtain Wall, Aluminium Rainscreen, High Security STS202 Doors
Systems: AluProf MB79 / MB86 Windows and Doors, AluProf MBSR60N Aluminium Curtain Wall, AluProf MB77HS Sliding Doors

As the third and final phase of the Imperial Street / Leaside Lock development, this will bring to a close a monumental regeneration of this trendy area of east London. An additional 200+ homes have been created, with the whole Leaside Lock development adding 965 modern homes to the London housing market.

Phase 3 consists of three tower blocks, traditionally built with a range of masonry and high-performance glazing systems (windows, doors and curtain wall) – the latter being designed, supplied and installed by Alliance Facades – as they have been on the previous two phases.