LEASIDE LOCK PHASE 3 EAST LONDON
As the third and final phase of the Imperial Street / Leaside Lock development, this will bring to a close a monumental regeneration of this trendy area of east London. An additional 200+ homes have been created, with the whole Leaside Lock development adding 965 modern homes to the London housing market.
KIDBROOKE STATION SQUARE, LONDON
Alliance Facades were contracted by Ardmore Construction to carry out the design, supply & install of the glazed high-performance curtain wall and external doors at Kidbrooke Station Square
THE STAGE BUILDING 4, SHOREDITCH
The “Stage” is a mixed-use development located within the London district of Shoreditch. The wider site development comprises a 38-storey residential tower, two office buildings of the Hewett and the Board, the archaeological remains of Shakespeare’s Curtain Theatre, retail/bar/restaurant space, and a central landscape courtyard
THRAYLE HOUSE, BRIXTON
Alliance Facades were engaged by Henry Construction to complete the aluminium windows, doors and curtain wall (all Wicona), natural stone cladding and solid aluminium rainscreen panels to 3 six-storey blocks and the twenty-storey residential tower.
ADELPHI, LONDON CITY
Alliance Facades were engaged by SGG when Spotify, the music streaming service, were moving into several floors of Grade A office space following the initial refurbishment works.
WESTGATE HOUSE, EALING
CJ O’Shea contracted Alliance Facades to provide an architectural glazed solution to the large internal atrium of the existing Westgate building, where the Kawneer AA540 windows allow light to pour into the living space from the rooflight above. G.